Case Study

    How Adaptive Automation Cut HVAC Energy 19% and Eliminated LL97 Penalties

    A Fortune 50 telecom operator used Verdigris to drive 19% chiller energy reduction, 8% PUE improvement, and $21K/yr in avoided LL97 penalties at a 220,000 sq ft NYC data center. 116% ROI. 10-month payback.

    Fortune 50 U.S. Telecom
    Data Centers
    New York, NY
    Data center cooling plant with adaptive automation optimization overlay
    19%

    HVAC Energy Cut

    Chiller plant energy reduction over 12 months

    8%

    PUE Improvement

    Continuous chiller supply temperature optimization

    116%

    ROI

    10-month payback on $78.6K investment

    $21K/yr

    LL97 Penalties Avoided

    NYC carbon compliance through energy reduction

    LL97 compliance and energy optimization are not separate workstreams. The same Adaptive Automation system that cuts HVAC energy is the compliance tool. The M&V data it produces is what you submit to the regulatory authority.

    Energy & Sustainability Lead, Energy & Sustainability at Fortune 50 U.S. Telecom

    The Challenge

    A Fortune 50 U.S. telecom operator runs a 220,000 sq ft data center in New York City, directly in the crosshairs of Local Law 97. LL97 sets hard carbon emissions caps per square foot, and for a facility this size, exceeding the limit means fines that compound annually at $268 per metric ton of CO2e over the cap.

    But compliance was only half the problem.

    Sub-Optimal PUE

    No automated method to continuously tune cooling

    Reactive Setpoints

    Manual adjustments happened after problems, not before

    No Auditable M&V

    Results needed to be defensible to leadership and auditors

    No Replicable Model

    Even if this site improved, no playbook for portfolio rollout

    The ask was clear: prove AI-driven optimization works at this site with verifiable results, then provide a model that scales across the portfolio.

    The Approach

    Verdigris deployed in two phases, designed to establish a defensible baseline before activating continuous optimization.

    Phase 1: Metering and LL97 Baseline

    The foundation: 8 Energy Data Gateways with CTs across mains and the central cooling plant. BMS integration via Tridium/BACnet provided read/write access to chiller setpoints. Metered assets included chillers, CRAC units, and DC plant load.

    1,506

    Circuits Instrumented

    Across 55 electrical panels

    8

    Energy Data Gateways

    Mains and central cooling plant

    8.46

    LL97 Cap (kgCO2e/sq ft)

    Emissions baseline established

    This phase established the emissions baseline for LL97 reporting and gave the optimization engine the data it needed to understand cooling plant behavior under real operating conditions.

    Phase 2: Adaptive Automation

    Verdigris Adaptive Automation is an optimization algorithm that uses machine learning and integrates energy modeling with electrical data. It automatically updates chiller water supply temperature setpoints every 15 minutes based on:

    • Real-time weather conditions
    • BMS sensor inputs from across the cooling plant
    • Utility rate structures
    • Thermal load patterns

    All optimization stays within ASHRAE 90.1 bounds through operator-configurable safety rails, so the engineering team defines acceptable operating ranges.

    Built-In A/B Testing

    Baseline comparison runs execute 4x daily to isolate Adaptive Automation savings from weather and load changes. All results are measured against IPMVP protocol, the gold standard for energy measurement and verification. This makes every data point auditor-defensible.

    The Results

    Over a 12-month period (2024-2025), Adaptive Automation delivered results across energy, compliance, and financial metrics.

    19%

    HVAC Energy Reduction

    Chiller plant consumption

    8%

    PUE Improvement

    Continuous optimization

    270K kWh

    Annual Savings

    ~$38K/yr in utility costs

    $21K/yr

    LL97 Penalties Avoided

    Carbon compliance through efficiency

    Financial Impact

    MetricValue
    Total investment$78,593 (hardware + professional services + software year 1)
    ROI116%
    Payback period10 months
    Annual utility savings~$38,000
    Annual LL97 penalty avoidance~$21,000

    The LL97 math: 270 MWh saved x 0.289 tCO2/MWh x $268/ton = ~$21K/yr in avoided penalties.

    Annualized Performance

    At this NYC data center, continuous operation of Verdigris Adaptive Automation achieves an annualized savings of 20.7% reduction in chiller energy use, avoiding 405.1 MWh and saving $40,510 during a typical meteorological year. These annualized figures normalize for weather variation and provide the defensible baseline for long-term financial projections.

    The Key Insight

    LL97 compliance and energy optimization are not separate workstreams. The same Adaptive Automation system that cuts HVAC energy is the compliance tool. The IPMVP-compliant M&V data it produces is what gets submitted to the local regulatory authority. One system, two outcomes.

    Related: Equipment Health at the Same Facility

    At this same facility, Verdigris Signals detected cooling tower gearbox degradation three months before failure, converting a potential $250K-$300K emergency into planned maintenance. Read the full case study.

    What's Next

    Building on the success at this site, the operator is expanding Verdigris Adaptive Automation to additional NYC data center facilities for compliance reporting and energy cost savings.

    The expansion follows the same two-phase model: metering and baseline establishment first, then Adaptive Automation activation. Each site gets its own IPMVP-compliant M&V framework, ensuring results are defensible on a per-facility basis.

    The portfolio approach amplifies the financial case. With LL97 penalties compounding annually and applying to every covered building in New York City, the avoided penalty exposure scales linearly with each new facility brought online.

    We proved AI-driven optimization works with verifiable results. Now we have a model we can scale across the portfolio.

    GRE Budget Director, Global Real Estate at Fortune 50 U.S. Telecom

    Key Takeaways

    What Made This Project Successful

    • Compliance as a forcing function: LL97 penalties created urgency and executive sponsorship for energy optimization
    • IPMVP-compliant M&V: Built-in A/B testing and polynomial regression models made results auditor-defensible from day one
    • BMS integration: Tridium/BACnet read/write enabled continuous optimization beyond passive monitoring
    • Safety rails: ASHRAE 90.1 bounds gave the engineering team confidence to let automation run continuously
    • Replicable methodology: The same deployment model is now being applied across additional NYC facilities