Every load class, one platform
Voltage plotted against current produces a phase portrait: a closed figure as distinctive as a fingerprint. Each load class leaves its own shape. A clean ellipse for a resistive load. A tilted loop for an induction motor. Harmonic complexity for a six-pulse rectifier. A tight diagonal trace for a near-unity-PF active-PFC GPU rack.
The validated layer does the work
Verdigris reads every circuit at 8 kHz and turns that raw signal into truth your applications can act on. Several jobs, one layer. See how the validated layer proves every limit.
Measures everything
Every circuit at 8 kHz, sub-cycle. The resolution degradation and fast transients actually live at.
Normalizes across vendors
One model across Schneider, Eaton, Vertiv, and the rest. Incumbent meters become contributors, not competing sources of truth.
Validates against physics
Real safe headroom per circuit, in amps and kW, derived from waveform physics, not nameplate.
Detects degradation early
The harmonic and phase shifts that precede failure, weeks before any threshold alarm fires.
Keeps the record
A labeled history of every circuit for forensics, capacity trends, and defensible SLA proof.
Publishes it openly
Validated operating limits, sub-second state, and equipment health over open interfaces: REST, MQTT, Modbus, BACnet.
- ApplicationsSignals · Your orchestration
- Validated layerMeasure · Normalize · Validate · Detect · Record · Publish
- SensingEV2 gateway · Smart CTs · Incumbent meters
The applications that run on it
Two kinds of application consume the validated layer.
Signals is Verdigris's own application. Operators triage degradation and root cause in one inbox; tenants get SLA proof from the same stream. At a Fortune 50 carrier it caught silent degradation no BMS alarm had flagged, up to 21 days before failure. See Signals
Your orchestration is whatever control software you already run. It reads the validated operating limits and acts: throttle GPUs, tune cooling, schedule capacity. Verdigris stays the validated layer beneath it, so you keep control on whatever platform you orchestrate with. See the integration surface
Both run on the same validated limits. See the full deployment proof and ROI on the validated layer.
Built on purpose-built hardware
Clamp-on CTs install in minutes per panel with zero downtime. Cellular backhaul requires no firewall changes. Data goes live on Day 1.
Verdigris EV2 Power Meters. Standard circuit-level monitoring for data centers.
Verdigris EV2 Pro Power Quality Meters. Forensic 8 kHz waveform capture for mission-critical environments.
Works with your existing infrastructure
Verdigris ingests data alongside Schneider, Honeywell, and Eaton monitoring systems. As the substrate, Verdigris becomes the canonical model. Incumbent systems become data contributors rather than competing systems of record.
See what operators recovered
Read how a Fortune 50 carrier used Verdigris to surface 1 MW of stranded capacity at a single facility, worth $8M to $14M per MW in deferred CapEx and roughly $100M projected portfolio-wide.